Tetlow Kilns & Furnaces

Salt Fog Corrosion Testing and ASTM B117

We’ve all seen it, a low-lying cloud formation known as a marine layer coming onshore from the ocean.  But what it consists of and actually represents is bad news for anything exposed to that corrosive environment and leads to a trillion dollars of costs associated with the impact of corrosion.   Of course, this is only one factor of many, which create corrosion related issues for many companies around the world.  But the issue remains, how to keep our customers product from failing within its warranty period.  This is where corrosion testing comes into play.

One aspect in corrosion testing has been referred to as salt fog, salt spray or just plain corrosion testing and all would be correct but we prefer to call our equipment as Advanced Weathering Testing Equipment since this is really what it represents.   A method of testing components that are exposed to outside elements such as UV light, rain, condensation and of course, salt fog exposure.   And as we continue to gather greenhouse gasses into our atmosphere, the advent of acid rain is very prevalent in our everyday lives and this slightly acidic rain must be taken into consideration also for our everyday products as well.

In the world of standards compliance regarding salt fog testing, ASTM B117 represents the baseline criteria regarding testing procedures and practices involving salt spray/fog testing.  This article will dive deeper into ASTM B117 and point out that not all “salt fog” chambers are created equal.

ASTM B117-11 is the latest edition of this worldwide standard and covers all baseline design parameters for anything related to salt fog corrosion testing.  The relevancy of this 12 page document is apparent because it tells us how equipment should be built and why, details on solution preparation.  So with that, allow me to point out the key parts of this standard and how Equilam North America builds equipment, which is 100% compliant to this standard.

Key Points in Salt Fog Design per ASTM B117-11

  1. Drops of solution which accumulate on ceiling or cover shall NOT be permitted to fall onto specimens.   Lid design is critical here, the lid must be between 90-120 degs per the standard.  However, it must be realized that lid material is critical as well since some materials such as acrylic can “etch” over time when exposed to this 5% salt solution and could allow for droplets to accumulate and fall onto the DUT.  This is immediate disqualification of test if this happens.
  2. Double wall housing filled with either water or air to assure the equilibrium of temperature of the inner chamber.  All salt fog units are double wall with heated, insulated water jacket.
  3. Material of construction shall be such that it will not affect the corrosiveness of the fog.  Is there is metals inside the chamber during the test?  Any non-coated heating elements? Any metallic hanging rods for the product?  Any stainless steel with zinc components? This condition is essentially creates a battery type atmosphere when exposed to salt water.  This clause is placed inside the standard to eliminate any metallic objects inside the test area which could create false readings.
  4. ASTM specifically calls out distribution of fog and collection points.  Standards compliant salt fog chambers have a minimum size due to the necessity of uniformity in collection points stipulated at 1.0-2.0 mL of solution per hour based on an average run of 16 hours over an area of 12.4 square inches.
  5. The use of immersion heaters in an internal salt solution reservoir or within the chamber is detrimental where heat losses are appreciable because of solution evaporation and radiant heat on the specimens.   Once again pointing to metals inside the

latest news

How To Choose And Start A Program With Stafford Programmer

Programmer Brand: Stafford ST316B Programmer

How To Go Through Stafford Program`s Recipe - Step By Step

This video will take you through step by step the entire recipe for Program 2 - Medium heat rate bisque 1000°C firing. Programmer brand: Staffor...

Electrification Conversion of your gas furnaces an

We all live in a world where burning fossil fuels will be phased out, and with this green world we are entering in, Tetlow is now offering the potenti...

Thermal Oxidizer

We have a new product for you, see the detail in the Products tab

Tetlow Drone Video Presentation

Tetlow now has a drone video of what we build and shows a little of our factory and products. Check it out below or by pasting the following link...

Tetlow has gone to 3D design Modelling

Tetlow has invested in updating software to do all designs in Inventor 3D  

Tetlow is still open (COVID-19)

At at 20 August 2021, Tetlow is still open and operating and following the government COVID-19 protocols.In addition, we are operating with a stagered...

Tetlow launches new general Kilns Manual

We have released a more detailed General Kilns Manual, August 2022, which has more detail on general kilns running, maintenance and daily use Have ...

Tetlow Is a registered Electrical Equipment Safe

We have registered and comply with this new requirement that all importers, manufacturers and suppliers in Australia of electrical equipment which cou...

Tetlow is rebranding its self

See our new look web page, we are working on continously listening to our customers and the market suggestions and our new clear, bold new logo is whe...

Tetlow sells its first Solar simulator

Tetlow partnered with ,Eternal sun in the Netherland, has made our first sale of a solar simulator to an Australian university.  Tetlow will be s...

Repair and Servicing of Kilns

Tetlow is and has for many year being repairing and servicing other brands of kilns, Ge&Ge, Duncan, Ward, Porta kiln and many more.   We of...

Tetlow Now Selling Spare Parts From the Web Page

Have a look at our spare parts now avaliable from the web page

Tetlow design staff are working hard on your proje

Stef working through a design for a new project Stefan Teran has been working with Tetlow's for more than 16 years.  He is knowlegable ...

Tetlow trains our Electrical engineer

Tetlow is commited to a culture of learning and training The photo is of our new electrical engineer, Cherrie, who has now built and wired and f...

International Furnace Exports

Tetlow has recently proudly designed, build and shipped a furnace to South-East Asia in accordance to client's specification.  This furn...

New Solar Equipment Product

As the new year approaches, before we break for Christmas, Tetlow is proud to announce that we are now the Australian agent for Eternal Su...

Tip: Controls and Programmers

Regular questions are always asked to Tetlow in regards to the control system, so heres a post that we hope helps! - All kilns and furnaces need a me...

New Color Changing Tetlow Mugs!

Tetlow has ordered new mugs that are now available and in stock! These colour changing mugs will alter its appearance when heated, it is a reflec...

New Websites

Tetlow Kilns & Furnaces is growing and changing! Review and remark on our new website

School Promotion

As part of one of the many new ideas you will hear from Tetlow in the coming days, first off is a school promotion currently held for our two most pop...

Reminder - New Location

After being located at 12 George Street, Blackburn for the past 40 years, Tetlow has officially moved! Under the new management, we are now located in...